Inside laminated low-e double glazing
Inside laminated low-e double glazing
-
Low-e double glazing, 4 mm - spacer (A) - #33.1Double glazing with low-e coating and Argon gas: 4 mm glass - spacer - laminated 33.1
€136.50per m² -
Low-e double glazing, 4 mm - spacer (A) - #33.2Double glazing with low-e coating and Argon gas: 4 mm glass - spacer - laminated 33.2
€153.00per m² -
Low-e double glazing, 4 mm - spacer (A) - #44.2Double glazing with low-e coating and Argon gas: 4 mm glass - spacer - laminated 44.2
€178.25per m² -
Low-e double glazing, 5 mm - spacer (A) - #33.1Double glazing with low-e coating and Argon gas: 5 mm glass - spacer - laminated 33.1
€144.75per m² -
Low-e double glazing, 5 mm - spacer (A) - #33.2Double glazing with low-e coating and Argon gas: 5 mm glass - spacer - laminated 33.2
€162.50per m² -
Low-e double glazing, 5 mm - spacer (A) - # 44.2Double glazing with low-e coating and Argon gas: 5 mm glass - spacer - laminated 44.2
€186.25per m² -
Low-e double glazing, 5 mm - spacer (A) - # 55.2Double glazing with low-e coating and Argon gas: 5 mm glass - spacer - laminated 55.2
€229.50per m² -
Low-e double glazing, 6 mm - spacer (A) - # 33.1Double glazing with low-e coating and Argon gas: 6 mm glass - spacer - laminated 33.1
€151.25per m² -
Low-e double glazing, 6 mm - spacer (A) - # 33.2Double glazing with low-e coating and Argon gas: 6 mm glass - spacer - laminated 33.2
€170.75per m² -
Low-e double glazing, 6 mm - spacer (A) - #44.2Double glazing with low-e coating and Argon gas: 6 mm glass - spacer - laminated 44.2
€194.50per m² -
Low-e double glazing, 6 mm - spacer (A) - #55.2Double glazing with low-e coating and Argon gas: 6 mm glass - spacer - laminated 55.2
€237.50per m² -
Low-e double glazing, 8 mm - spacer (A) - #44.2Double glazing with low-e coating and Argon gas: 8 mm glass - spacer - laminated 44.2
€221.25per m² -
Low-e double glazing, 8 mm - spacer (A) - #55.2Double glazing with low-e coating and Argon gas: 8 mm glass - spacer - laminated 55.2
€262.75per m²
Do you also need a trickle vent with your new insulating glass? Have a look at our trickle vents.
Let goed op de NPR 3577: dat zijn de Nederlande Praktijk Richtlijnen. Hierin staat onder andere het volgende beschreven over de montage van isolatieglas in houten kozijnen:
- De sponninghoogte dient minimaal 17 mm te zijn
- Bij het bepalen van de omtrekspeling dien je 1/3 x sponninghoogte aan te houden, waarbij deze minimaal 5 mm is. De dikte van beglazingsblokjes is gelijk aan de omtrekspeling
- De breedte van de vereiste beglazingsblokjes is: glasdikte + 2 mm (dit mag ook iets meer zijn, maar zeker niet minder)
- Bij de montage dien je aan weerszijden van het glas beglazingsband te gebruiken van 4 mm dik. Dit moet je dus optellen bij de totale glasdikte van het isolatieglas, als je wilt berekenen of je isolatieruit in je kozijn past, met de glaslatten erop gemonteerd.
Oftewel: glasdikte van de isolatieruit + 8 mm glasband = benodigde ruimte tussen kozijn en glaslat - De afdichting tussen...